Here is the plan:
1. Tear out the back window and create an egress window into the new bedroom.
2. Tear out the floor and drop in down 7 inches and pour a new floor.
3. Add full bath
4. Bedroom
5. Play room
6. Laundry area
7. Add sump pump and tile drain system to keep the whole basement dry.
It should be very nice. The worst part of the whole experience is that we will be without laundry during the renovation. Thankfully it is lakehouse time and we will be up at the lake most weekends and can take our laundry. Here are some before pictures...
This area will be the bedroom. It will have the egress window and a closet.
This will be the full bath.
This will be a small storage area with the laundry in front of it.
This will be the play room. All those nasty windows will also be changed out for new ones.